Repository navigation
qa: build - #819
qa: build#819fizzy-macos[bot] wants to merge 1 commit into
Conversation
A script over scripts/zb that builds origin/main (or a pull request) in Debug, builds the pinned pixi, drive and example-plugin against that tree's SDK, installs each build with a seeded QA profile (fixtures: text, pixi, a 20,000-file folder, a 300-commit history), and keeps the last 3 of each kind. See docs/QA.md. Agent-Team: macos Worker: claude Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>
PM note: how this PR will be handledWhat it is for: qa: build Rules that apply: none special. Things to watch (checked by rule):
What happens next:
A living status comment below is kept current. Nothing here is a merge decision. |
Where this PR standsStage: Author's turn What the PM needs before approving (ticks as it is met; the full CI runs only at the end, after the reviews are clean):
Reviews at the current commit (
Latest fixes comment: https://github.com/fizzyedit/work/issues/205#issuecomment-6387876791 (0 findings answered) Updated 2026-10-27 14:20 UTC by the PM. This comment is edited in place. |
|
PM ruling (2026-10-28, foxnne asked about days-old PRs): parked, not rejected. This PR has been in its author's turn since 10-27 with open findings and no writer on its rework (the rework issue is on hold), it is not on the input-day list, and main has moved a lot since (ScrollArea, web/fizzy.js, CI). The branch is kept. The work issue stays open: when it is prioritised it restarts from current main with the findings as the checklist (a fresh PR, or this branch rebased: reopen is fine). |
Part of fizzyedit/work#202
Changes
Gates
scripts/check-fmt.sh(exit 0)scripts/zb build --summary all(exit 0)scripts/zb build test --summary all(exit 0)scripts/zb build test-integration --summary all(exit 0)scripts/zb build check-web --summary all(exit 0)scripts/zb build test-sdk-version --summary all(exit 0)